ESTIMATION & INTERPRETATION
Recovery Estimates & Economic Limitations
Recovery calculations provide simplified mass-balance
estimates. Actual processing outcomes and economic
value depend on additional technical and commercial
factors not represented by this calculator.
Metallurgical Testwork
Recovery assumptions may be informed by laboratory
tests, pilot-scale studies, or historical plant
performance. Representative samples and suitable
test procedures are important for evaluating
processing behavior.
Results from a limited sample set may not represent
all ore types, alteration zones, or operating
conditions across a deposit.
Processing Variability
Recovery can change as ore hardness, mineralogy,
particle size, feed grade, reagent conditions,
and other process variables change.
A single recovery percentage is a simplifying
assumption and may not accurately describe
performance throughout the life of an operation.
Gross Value vs. Economic Loss
The gross value of unrecovered metal represents
the unrecovered metal quantity multiplied by an
assumed price. It is not equivalent to lost
revenue, lost profit, or an economically
recoverable opportunity.
Recovering additional metal may require greater
operating costs, capital investment, or different
processing methods. Commercial terms and
payable-metal deductions can further affect
realized value.
Resource and Project Economics
Contained metal, recovered metal, and gross metal
value are distinct from mineral resources,
mineral reserves, and project profitability.
Economic evaluations require additional assumptions
concerning mining, processing, capital and
operating costs, commodity prices, recoveries,
and other technical and commercial factors.